This panel EXAMPLE made 14%.

A panel upgrade that ran long still looks like revenue. This EXAMPLE made 14% after the extra hour and the breaker pack. Job costing shows labor burden against the bid.

Owner-run work — not a crew platform.

Where margin leaks

  • Panel extras discovered after the bid
  • A return trip that was never on the estimate
  • Breaker packs and lugs over the pricebook
  • Service calls bid as a flat that did not cover drive time

Starter electrical pricebook

Panels, circuits, service calls. Light EXAMPLE lines for this trade. You still set the rate. Not an AI estimate. We do not write the next bid from past jobs.

  • · 200A panel — $640
  • · Breaker pack / lugs — $180
  • · EV charger circuit materials — $220
  • · Journeyman electrician — $105/hr

Primary path: this EXAMPLE. Close the prefilled job to read the scorecard. 10 open — last 10 closed visible. Pro is $29/mo.

EXAMPLE

Line & Load Electric — 200A panel upgrade

JOB-0881 • closed

Profitable
Bid
$3,200
Actual cost
$2,740
Margin
$460
Margin %
14%

Hours 8.0 bid → 9.5 actual

Hours: 8.0 bid → 9.5 actual · breaker pack over

Try this panel EXAMPLE free

Open the EXAMPLE job. Close it. See if it paid. Then run a real one.