What should I charge per hour.
Turn a burdened rate and a target margin into a charge-out number for the bid. Default rate is the Ridge $90 EXAMPLE. Nothing stored.
Charge-out rate
$138.46/hr
$90.00 ÷ (1 − 35%) = $138.46/hr on the bid. Load the wage first on the labor burden calculator. This is arithmetic, not a market survey.
The formula, in plain English
Charge-out $/hr = burdened rate ÷ (1 − target margin). Confirm the loaded wage on the labor burden calculator first. This is not a wage survey and not tax advice.
This is a sketch. Put the rate on a real job and see if it held.