Skip to content
CostPerJob
Free tools

Estimate vs actual template.

An in-browser table: estimate, actual, variance. Print it or download CSV. This is a template, not a saved job. Nothing stored.

LineEstimateActualVariance
-$130.00
-$18.00
-$220.00
-$500.00

Estimate $2,480.00 · Actual $1,612.00 · Variance -$868.00 · Margin $868.00

The formula, in plain English

Variance on a line = actual − estimate. Job margin $ = bid total − actual total. Cadence for running this on every job is in the estimate vs actual guide.

This is a sketch. CostPerJob keeps estimate + costs on one job.