Estimate vs actual template.
An in-browser table: estimate, actual, variance. Print it or download CSV. This is a template, not a saved job. Nothing stored.
| Line | Estimate | Actual | Variance | |
|---|---|---|---|---|
| -$130.00 | ||||
| -$18.00 | ||||
| -$220.00 | ||||
| -$500.00 |
Estimate $2,480.00 · Actual $1,612.00 · Variance -$868.00 · Margin $868.00
The formula, in plain English
Variance on a line = actual − estimate. Job margin $ = bid total − actual total. Cadence for running this on every job is in the estimate vs actual guide.
This is a sketch. CostPerJob keeps estimate + costs on one job.